Hi Don,
Thank you for all your hard work on this. I don't want to be too negative here but since it sounds like major re-routing is being done is a another prototype going to be ordered to ensure no other errors are being introduced in the final product? Also I am confused as to what the problem was with the switch placement on this design. It looks like the switches are symmetrical top to bottom so I don't see how they could be "upside down".
Regards,
Jeff
On 8/19/2014 1:08 PM, Don Caprio wrote:
I had to reroute the board and the autorouter is giving me fits.
Completed once after a week but couldn't save session file. The checkpoint
file I saved hangs after a few hours so I'm forced to start from scratch.
Sorry for the delay.
--You received this message because you are subscribed to the Google Groups "N8VEM-S100" group.
To unsubscribe from this group and stop receiving emails from it, send an email to n8vem-s100+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.